Years serving Seattle
Panel upgrades
Licensed electricians

Panel and service review before installation

Clear next steps for your electrical upgrade

Permits and inspections when required
From panel upgrades and EV chargers to heat pump prep, generators, and full home electrification, we help make your property ready for modern power demands.

We evaluate your panel, service capacity, existing load, and safety conditions before you add new electrical equipment.

Upgrade outdated or overloaded panels and increase service capacity for modern electrical needs, including 200A upgrades.

Install a dedicated Level 2 EV charging circuit with panel capacity verification and code compliant setup.

Prepare your home for heat pumps, mini splits, AC systems, electric appliances, and gas to electric conversions.

Install standby generator systems, portable generator inlets, and transfer switch connections for reliable backup power.

Add capacity for garages, workshops, backyard offices, additions, detached buildings, and future upgrades.
Major electrical upgrades often involve more than the installation itself. We coordinate permits, inspections, and utility requirements with Seattle City Light, Puget Sound Energy, and local jurisdictions when your project requires it.
From planning to final inspection, we help keep your project moving.
Not sure if your home can support an EV charger, heat pump, electric water heater, tankless system, generator, or full home electrification?
Start with a professional assessment. We review your panel, service capacity, existing load, and upgrade options so you know what your home can safely handle before the project begins.
Not sure if your property is within our service area? We can confirm availability during your assessment request.
Many modern home upgrades require more electrical capacity than older systems were designed to handle. If any of the situations below sound familiar, your home may need an assessment or upgrade.
Installing a Level 2 EV charger is not just about mounting the charger on the wall. Your home needs the right panel capacity, circuit setup, and electrical support for safe and reliable charging. We evaluate your system first, then complete the installation the right way.
Seattle Power Upgrade is focused on modern electrical capacity, safety, and long term reliability for homes, rental properties, and light commercial spaces. Our work is performed by Washington State licensed electricians and completed with proper permits and inspections when required.
Since the early 2000s, our team has helped property owners prepare their electrical systems for EV charging, heat pumps, backup power, additions, backyard offices, and full home electrification.
We keep the process simple, clear, and professionally managed from the first assessment to final completion.
Schedule Your Assessment
Tell us what you want to add or upgrade. We schedule an on-site visit to review your goals, property, current electrical system, and future power needs before recommending the right solution.
Get a Clear Upgrade Plan
We evaluate your panel, service capacity, existing load, and upgrade options. You get clear next steps, including permits, utility coordination, and inspection requirements when needed.
Complete the Installation
Once everything is approved and scheduled, our licensed electricians complete the work safely, cleanly, and to code. Most on-site work is completed in 1 to 2 working days.
Not always. Some homes can support a Level 2 EV charger with the existing panel, while others may need a panel upgrade, service upgrade, or load management solution. We evaluate your panel capacity, existing load, and charging needs before recommending the right setup.
Yes. Heat pumps, mini splits, and AC systems can add significant electrical demand. We review your panel, service capacity, available circuits, and equipment requirements to confirm whether your home is ready or needs an upgrade first.
Yes. When permits and inspections are required, we help manage the process and complete the work according to applicable code requirements. This helps keep your project safe, compliant, and properly documented.
Most on site installation work is completed in 1 to 2 working days once permits, scheduling, and utility coordination are in place. The full project timeline can vary depending on the scope of work, permit approval, inspection availability, and utility requirements.
We coordinate with local utility providers when required, including Seattle City Light and Puget Sound Energy. This may include service upgrade approval, meter access, disconnect and reconnect scheduling, and other utility requirements.
Yes. The $249 Power System Assessment fee is credited toward upgrade projects over $5,000. This allows you to start with a professional evaluation and apply that cost toward a larger approved project when applicable.
If you didn’t find the answer you were looking for, please contact us using the form below. We’ll be happy to help.